Here you can specify the exact parameters for the Accumulated costs by destination report.
Service
Link copied to clipboard
Select a service that this report shows accumulated costs for.
Vendor
Link copied to clipboard
The vendor for whom the report will be calculated.
Reporting period
Link copied to clipboard
In the Reporting period section you can choose a particular period to analyze the data for.
- Select the Set exact dates option to specify a Start date and an End date for the report calculation period. These values will always stay the same for any report that is generated. For example, you can set “2018-10-10 05:08:46” as the Start date and “Now” as the End date. This means the report will cover the period from “2018-10-10 05:08:46” to the moment the report is generated.
- Select the Use offsets from the run date option to specify a moment in time when an offset from the scheduled report is generated. For example, you can set the Start date for 5 hours before and the End date for 2 days after the report is generated.